How much time should I allow for planning an exhibition stand?

In an ideal world one would be looking at starting the design and planning process around four months prior to the exhibition opening. This would allow for careful management of the project and also would provide sufficient time to make any changes that may occur however should decisions have to be made that result in a limited time frame being available then it is still possible to design and deliver an exhibition stand within around two weeks however this will be dependent on the size and scale of the project.

In extreme circumstances it is possible to deliver an impressive stand solution in as few as 3 days however the design options would be limited and in this instance we would be proposing existing modular or custom elements in order to avoid lengthy construction issues.